Each unit will consist of a gas turbine, a steam turbine and a generator. The gas and steam turbines will be manufactured by MHI and Mitsubishi Electric Corporation will build the generators. The order marks MHI’s first large-size power generation system order received from Ukraine and the new 150 MW units are scheduled to go on-stream in March and September 2009, respectively