The plant will use circulating fluidised bed (CFB) boilers, specifically designed to utilize Petcoke fuel and will be installed at Bina in Madhya Pradesh for the Bharat Oman Refinery. The first of the three 33 MW units is slated for commissioning in 26 months, with the project completed within 30 months.
BHEL wins captive plant contract
Bharat Heavy Electricals (BHEL) has received a Rs 9,500 million ($202 million) contract for the supply of a 99 MW power plant.