Construction at Ferrybridge was due to start in May 2023, with grid connection confirmed for June 2024 and operation planned by October 2024.

Sungrow’s PowerTitan adopts advanced liquid-cooled thermal management and AI monitoring of the battery cells so as to safeguard system safety and ensure maximum lifespan.

 

 

 


Image: Sungrow PowerTitan liquid-cooled energy storage system