GS EPS adds dependable renewable plant to South Korea’s grid

29 August 2019



Operating experience with the Dangjin Bio-1 plant has demonstrated the many advantages of circulating fluidised bed technology, not least of which is exceptional fuel flexibility. The plant is operating successfully (meeting output and emissions guarantees) on a very varied mix of fuels, including coal and palm kernel shells, as well as wood waste, which was not included in the initial power plant design criteria. By Robert Giglio, Sumitomo SHI FW


South Korea, a country of over 50 million people and the world’s eleventh-largest economy, imports 96% of its energy due to a lack of indigenous energy resources. To improve energy security and its environmental score card, the government’s 8th energy plan calls for reducing the share of coal-fired generation, accelerating energy efficiency measures, and increasing investment in renewable energy.

The new energy plan also takes coal and nuclear new build off the table, leaving only the LNG option to keep up with growing base load power demand and replacement of the ageing fleet of coal power plants.

But since LNG is an expensive imported fossil fuel, it is not exactly a favoured solution. It doesn’t help lower the country’s energy deficit or reverse climbing energy costs. And even though highly efficiency combined cycle plants fuelled by LNG produce half the carbon dioxide emissions of a coal plant, these new plants will lock in decades of carbon emissions, undermining the country’s UN COP 21 commitments.

Like many other countries in Asia, balancing energy security, reliability and affordability with carbon emissions, is one of South Korea’s greatest challenges.

To ensure more renewables get on the country’s power grid, the government has enacted a renewable portfolio standard (RPS) requiring utilities and independent power producers with more than 500 MW of power generating capacity to produce 10% of their electricity from renewable resources by 2024.

To help the new renewable plants compete with lower cost power options like coal, renewable plants are awarded Renewable Energy Certificates (RECs). The RECs create a healthy financial incentive to build new renewable power plants in South Korea, but also serve as a large financial stick when utilities fail to meet their RPS goals. If a power company falls short of meeting their RPS goal, it must buy RECs at their current market price with a 150% penalty adder.

Under South Korea’s RPS programme, new biomass power generation capacity has grown an astonishing 409 MWe/year on average since the programme’s inception in 2012, as compared to only 7.5 MWe/year on average under the former FIT program over the 2001- 2011 period.

A different kind of renewable energy

GS Electric Power and Services (EPS), the first independent power producer in South Korea, owns and operates about 2500 MW of power generating capacity in South Korea. It is making big investments in renewable energy both domestically and abroad, well in excess of its mandated RPS goals.

Together with GS Engineering and Construction company (GS E&C), GS EPS has recently built the Dangjin Bio-1 plant, as shown in Figure 1. The Bio-1 plant is very different from a traditional renewable wind or solar plant. It needs only a small space to produce a lot of power and can deliver dependable base load power to the grid when needed. It is able to do this since it is fuelled by renewable biomass, agricultural byproducts and waste wood. The fuel can be stored and managed to ensure on-demand power delivery.

The 105 MWe power plant is the largest biomass plant operating in Asia, showcasing a new kind of renewable energy, one that can supply power when needed without being affected by the sun or wind.

Construction of the plant began on 13 May 2013, coming on-line 30 months later, on 1 August 2015. At the heart of the plant is an advanced circulating fluidised bed (CFB) boiler supplied by Sumitomo Foster Wheeler (SFW).

High value environmental solution

Historically, biomass and waste-to-energy plants have not been attractive investments. They often depended on small and fragile local businesses for their fuel supply, like lumber companies, paper mills, factories and trash companies. This limited their size and revenue streams while instilling a significant fuel supply risk into the long-term viability of the project.

In addition, the boiler technology was expensive, limited in size, not very reliable and required a lot of expensive pollution control equipment to meet environmental standards. These factors along with scarce government support, suppressed the growth of an environmentally valuable alternative to the landfill problem many countries are facing today.

Today, advancements in boiler technology and strong support from the South Korean government are changing history as showcased by the Dangjin Bio-1 plant. The plant can reliably fire a wide range of domestic and imported renewable fuels including clean and recycled wood chips, virgin biomass, wood pellets, and palm kernel shells (PKS). Its 105 MWe capacity is three times larger than traditional biomass or WTE plants, and it doesn’t need air pollution control equipment after the CFB boiler to meet today’s strict clean air standards. 

True demo of fuel flexibility

The SFW CFB has given GS EPS the flexibility to fire endless combinations of carbon neutral biomass and waste fuels, as well as coal. Back in 2012 when the Dangjin Bio-1 project was being developed, restrictions on coal use were not as strong as they are today in South Korea. Thus, the plant was originally designed to fire as much as 100% coal and as little as 10% coal with the balance coming from PKS (90% by heat content), about 1200 tons/day of PKS and other biomass.

During plant commissioning, the plant fired a blend of 80% PKS and 20% Russian bituminous coal. In October 2015, two months after commercial operation of the plant began, GS EPS increased the share of PKS to approximately 86%. The year ended with smooth plant operation at an average PKS share of 83%.

On the downside, the chipped wood waste that the plant also fires is a dirty, more corrosive fuel containing glues, resins, plastics, metal hardware, stones and glass. Since this fuel wasn’t included in the design criteria for the plant, it truly tested the fuel flexibility limits of the SFW CFB technology.

Remarkably, the CFB still achieved full plant output and all its emission guarantees when firing the waste wood.

GS EPS needs to shut down the CFB boiler every few months to clean out the accumulated debris (as shown in Figure 2), which could not pass through the bed ash drain system.

For GS EPS, the fuel flexibility benefits greatly outweighed the additional maintenance and downtime of the CFB boiler, so it has been blending the waste wood with PKS and coal at the 15% – 23% level.

Inspection of the boiler showed greater than normal erosion in some areas of the lower furnace, greater corrosion of superheater coils and more fouling in the boiler’s convective pass and air heater due to the higher chlorine, heavy and alkali metals in the waste wood.

In 2018, working with GS EPS, SFW made several modifications to the Dangjin Bio-1 CFB, which included replacing the fluidising grid with a step grid designed for firing waste and recycled fuels, adding additional erosion protection to lower furnace walls, adjusting boiler primary and secondary air flows and the air inlet temperature to air preheater.

Based on the experience with Dangjin Bio-1, GS EPS has decided to build a new biomass fuelled unit, Bio-2, again using SFW’s CFB boiler.

Boiler technology matters

An important benefit of the SFW CFB is the high plant reliability and lower plant maintenance requirements. The circulating solids keep the heat transfer surfaces in the furnace clean, minimising corrosion and fouling. The highest temperature superheating coils are protected from the corrosive flue gases in chambers of bubbling hot solids, called INTREX, reducing boiler maintenance and plant downtime.

The CFB boiler produces 390 tonnes/hour of steam at 130 bar(a), and 540°C.

Figure 3 shows the design of the Dangjin Bio-1 CFB.

The operational experience from the Dangjin Bio-1 plant clearly demonstrates the fuel flexibility of SFW CFBs, but there are many other environmental benefits of the SFW CFB technology that bring value to renewable plants like Dangjin Bio-1. For instance, SOx levels are controlled in the CFB boiler as the fuel burns by injecting limestone directly into the CFB boiler, avoiding the need for a flue gas scrubber system, reducing plant construction and operating costs while improving reliability.

Because of the flameless low temperature combustion process in the CFB boiler, formation of NOx emissions is also minimised. For most projects, selective catalytic reduction (SCR) systems are not needed, saving capital and plant operating & maintenance costs. Instead, selective non- catalytic reduction (SNCR) systems can be used, avoiding expensive SCR systems and SCR catalyst replacement costs incurred by other boilers.

For plants required to comply with very low NOx standards (under 50 ppm), SFW CFBs can employ a low cost hot SCR system located within the boiler, thereby delivering the optimal environmental compliance solution for the power plant owner. 

Figure 1. GS EPS’s 105 MWe Bio-1 CFB plant in Dangjin, South Korea, is the largest biomass-fired power plant in Asia.
Figure 3. Sectional drawing of the Dangjin Bio-1 CFB boiler
Figure 2. Debris removed from the CFB furnace when firing waste wood chips


Linkedin Linkedin   
Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.