Modernising Mehrum: 40 green MW from a coal plant
-
Installation of the IP rotor -
Mehrum -
The barrel type HP turbine during assembly at Mulheim -
Assembly of a blade ring for the new LP turbine -
Flue gas line 1, before modification -
Cylindrical airfoil -
Efficiency gains with the new steam turbine -
Flue gas line 1, after modification -
Side view showing simplified layout of modified line 1 -
Twisted airfoil (since late 70s) -
3DS (since late 90s) -
Installation of the IP inner casing -
Efficiency measurements following 2003 summer outage, compared with 2000 figures