Upgrading the turbine control and protection system at CNNC’s Qinshan Phase II unit 2
-
Qinshan Phase II site -
Qinshan Phase II unit 2 turbine mechanical overspeed bolt and trip lever -
Qinshan Phase II unit 2 turbine at completion of the outage – online... -
New redundant electro-hydraulic trip systems that replaced the mechanical... -
New redundant electro-hydraulic trip systems that replaced the mechanical...